Vietnam.png
To edit this page, log in and click on "edit with form" above
Vietnam

Description

Overview
Sector Energy
Focus area Renewable energy (wind)
Type of action Strategy/Policy
Scope National
Stage Under development
Submitted to UNFCCC registry Yes
Start of initiative 2015
Financing and support details
Financing status Seeking financing
Total cost US$ 34 mln
Financing requested US$ 34 mln
Financing received to-date
(no data)
Principal source of financing Multilateral
Principal type of financing Grant
Capacity building required Yes
Technology transfer required Yes
Additional information
Proponent(s) Ministry of Industry and Trade (MOIT), Insitute of Meteorology Hyrdrology ad Envrionment (MONRE)
International funder(s) UNEP
Organization providing technical support
(no data)
Contact
(no data)
Objective:

The objective of the NAMA is to promote wind energy by removing barriers on policy, capacity and technology.

Activities: (2016 - 2030)


  • Enhance the collaboration and the engagement of relevant ministries to development wind power development;
  • Improve the support for investment progress of wind projects.

The NAMA has two phases of implementation: 2016-2020 and 2021-2030. The target is to achieve the share of wind power around 0.7% and 2.4% of total electricity in 2020 in 2030 respectively.

Ouputs incude:

  • Develop a policy framework to support specific to wind power development in Vietnam
  • Implement capacity building support for wind power development
  • The technical barriers are eliminated through the development of instrumentation wind energy potential proposals for supporting the development of technical infrastructure and system maintenance repair wind power technology
  • Pilot implementation a wind power project with a planned capacity of 5 MW grid connected and build MRV system for wind power development in Vietnam

Support was provided by the Facilitating Implementation and Readiness for Mitigation Project (FIRM) funded by the Danish International Development Agency through UNEP."

  • Enhance the collaboration and the engagement of relevant ministries to development wind power development;
  • Improve the support for investment progress of wind projects.

The NAMA has two phases of implementation: 2016-2020 and 2021-2030. The target is to achieve the share of wind power around 0.7% and 2.4% of total electricity in 2020 in 2030 respectively.

Ouputs incude:

  • Develop a policy framework to support specific to wind power development in Vietnam
  • Implement capacity building support for wind power development
  • The technical barriers are eliminated through the development of instrumentation wind energy potential proposals for supporting the development of technical infrastructure and system maintenance repair wind power technology
  • Pilot implementation a wind power project with a planned capacity of 5 MW grid connected and build MRV system for wind power development in Vietnam

Support was provided by the Facilitating Implementation and Readiness for Mitigation Project (FIRM) funded by the Danish International Development Agency through UNEP." cannot be used as a page name in this wiki.

Impact and MRV

pChart

Cumulative GHG reductions: 66.6 MtCO2e
Mitigative capacity:

No information has been provided on mitigative capacity

Co-benefits:

Social: * Reduced costs associated with air pollution (healthcare and environmental)
  • Job creation and income improvement
  • Improvement in local infrastructure (road and service system)
Economic: * Job creation
  • Reduced expenditures in foreign currencies to import fuels for power generation
  • Reduced dependence on imported energy.
Environmental: * Improved local air quality
  • Displacement of energy generated by coal power plants

MRV Framework:

It is advised not to establish a new monitoring system for the proposed NAMA, but to use the existing monitoring and reporting system available for CDM projects.


References

The total financial support for this NAMA would be approximate US$ 34 million. In particular, budget for phase 1 is estimated about 14 million, comprising 41.2%. Budget for phase 2 is estimated around US$ 20 million, accounting for 59.8%. Contribution from the government of Viet Nam is about US$ 0.3 million.
Namespaces
Variants
Views

Difference between revisions of "Wind NAMA in Vietnam"

From NAMA Database
Jump to: navigation, search
Line 31: Line 31:
 
The NAMA has two phases of implementation: 2016-2020 and 2021-2030. The target is to achieve the share of wind power around 0.7% and 2.4% of total electricity in 2020 in 2030 respectively.
 
The NAMA has two phases of implementation: 2016-2020 and 2021-2030. The target is to achieve the share of wind power around 0.7% and 2.4% of total electricity in 2020 in 2030 respectively.
  
 +
Ouputs incude:
 +
* Develop a policy framework to support specific to wind power development in Vietnam
 +
* Implement capacity building support for wind power development
 +
* The technical barriers are eliminated through the development of instrumentation wind energy potential proposals for supporting the development of technical infrastructure and system maintenance repair wind power technology
 +
* Pilot implementation a wind power project with a planned capacity of 5 MW grid connected and build MRV system for wind power development in Vietnam
  
 +
Support was provided by the Facilitating Implementation and Readiness for Mitigation Project (FIRM) funded by the Danish International Development Agency through UNEP.
  
 
|Financing status=Seeking financing
 
|Financing status=Seeking financing

Revision as of 08:41, 9 March 2017



Vietnam.png
To edit this page, log in and click on "edit with form" above
Vietnam

Description

Overview
Sector Energy
Focus area Renewable energy (wind)
Type of action Strategy/Policy
Scope National
Stage Under development
Submitted to UNFCCC registry Yes
Start of initiative 2015
Financing and support details
Financing status Seeking financing
Total cost US$ 34 mln
Financing requested US$ 34 mln
Financing received to-date
(no data)
Principal source of financing Multilateral
Principal type of financing Grant
Capacity building required Yes
Technology transfer required Yes
Additional information
Proponent(s) Ministry of Industry and Trade (MOIT), Insitute of Meteorology Hyrdrology ad Envrionment (MONRE)
International funder(s) UNEP
Organization providing technical support
(no data)
Contact
(no data)
Objective:

The objective of the NAMA is to promote wind energy by removing barriers on policy, capacity and technology.

Activities: (2016 - 2030)


  • Enhance the collaboration and the engagement of relevant ministries to development wind power development;
  • Improve the support for investment progress of wind projects.

The NAMA has two phases of implementation: 2016-2020 and 2021-2030. The target is to achieve the share of wind power around 0.7% and 2.4% of total electricity in 2020 in 2030 respectively.

Ouputs incude:

  • Develop a policy framework to support specific to wind power development in Vietnam
  • Implement capacity building support for wind power development
  • The technical barriers are eliminated through the development of instrumentation wind energy potential proposals for supporting the development of technical infrastructure and system maintenance repair wind power technology
  • Pilot implementation a wind power project with a planned capacity of 5 MW grid connected and build MRV system for wind power development in Vietnam

Support was provided by the Facilitating Implementation and Readiness for Mitigation Project (FIRM) funded by the Danish International Development Agency through UNEP."

  • Enhance the collaboration and the engagement of relevant ministries to development wind power development;
  • Improve the support for investment progress of wind projects.

The NAMA has two phases of implementation: 2016-2020 and 2021-2030. The target is to achieve the share of wind power around 0.7% and 2.4% of total electricity in 2020 in 2030 respectively.

Ouputs incude:

  • Develop a policy framework to support specific to wind power development in Vietnam
  • Implement capacity building support for wind power development
  • The technical barriers are eliminated through the development of instrumentation wind energy potential proposals for supporting the development of technical infrastructure and system maintenance repair wind power technology
  • Pilot implementation a wind power project with a planned capacity of 5 MW grid connected and build MRV system for wind power development in Vietnam

Support was provided by the Facilitating Implementation and Readiness for Mitigation Project (FIRM) funded by the Danish International Development Agency through UNEP." cannot be used as a page name in this wiki.

Impact and MRV

pChart

Cumulative GHG reductions: 66.6 MtCO2e
Mitigative capacity:

No information has been provided on mitigative capacity

Co-benefits:

Social: * Reduced costs associated with air pollution (healthcare and environmental)
  • Job creation and income improvement
  • Improvement in local infrastructure (road and service system)
Economic: * Job creation
  • Reduced expenditures in foreign currencies to import fuels for power generation
  • Reduced dependence on imported energy.
Environmental: * Improved local air quality
  • Displacement of energy generated by coal power plants

MRV Framework:

It is advised not to establish a new monitoring system for the proposed NAMA, but to use the existing monitoring and reporting system available for CDM projects.

The total financial support for this NAMA would be approximate US$ 34 million. In particular, budget for phase 1 is estimated about 14 million, comprising 41.2%. Budget for phase 2 is estimated around US$ 20 million, accounting for 59.8%. Contribution from the government of Viet Nam is about US$ 0.3 million.