El Salvador.png
To edit this page, log in and click on "edit with form" above
El Salvador

Description

Overview
Sector Energy
Focus area Energy efficiency
Type of action Strategy/Policy
Scope National
Stage Under development
Submitted to UNFCCC registry No
Start of initiative
(no data)
Financing and support details
Financing status Seeking financing
Total cost EUR 76 mln
Financing requested
(no data)
Financing received to-date
(no data)
Principal source of financing Multilateral
Principal type of financing Grant
Capacity building required No
Technology transfer required No
Additional information
Proponent(s) National Energy Council Governmental El Salvador
International funder(s)
(no data)
Organization providing technical support
(no data)
Contact Luis Reyes, Executive Secretary, Address: Calle el Mirador y 9a Calle Poniente, #249, Col. Escalón, San Salvador, El Salvador, Phone: +50322337946, Email: lreyes@cne.gob.sv
Objective:

The Catalytic Program for Energy Efficiency in Public Buildings (ProCEEEP) will target technological changes in air conditioning systems and lamps that are currently installed in public buildings. In El Salvador, the consumption of electricity by government public buildings (including 7,255 buildings according to the latest government census) is about 245 GWh / year, equivalent to approximately 4.2% of the national demand, which was 5,833 GWh in 2015. ProCEEEP will have a duration of 5 years and will be aimed at reducing 26.84 ktCO2e (or 59.1 GWh) during the period of 2018 to 2022. This will be achieved through the replacement of 20% of the inefficient equipment currently used (air conditioners and lamps) by high efficiency technologies in the public building sector (e.g. inverter mini splits and LED lamps).

Activities: (Error: Invalid time.
ProCEEEP will involves a number of technical cooperation (TC) activities, including the institutional strengthening of the key stakeholders (CNE, MH, and the Ministry of the Environment and Natural Resources, MARN); the design of an EE M&E system, and capacity building for the COEEs.

Impact and MRV

No Data Available.png
Cumulative GHG reductions: 0.26 MtCO2e
Mitigative capacity:

No information has been provided on mitigative capacity

Co-benefits:

Social: Information has not been provided
Economic: Information has not been provided
Environmental: Information has not been provided

MRV Framework:
No MRV plan has been defined


Namespaces
Variants
Views

Difference between revisions of "Catalytic Program for Energy Efficiency in Public Buildings"

From NAMA Database
Jump to: navigation, search
 
Line 16: Line 16:
 
|Proponent=National Energy Council Governmental El Salvador
 
|Proponent=National Energy Council Governmental El Salvador
 
|Contact name=Luis Reyes, Executive Secretary, Address: Calle el Mirador y 9a Calle Poniente, #249, Col. Escalón, San Salvador, El Salvador, Phone: +50322337946, Email: lreyes@cne.gob.sv
 
|Contact name=Luis Reyes, Executive Secretary, Address: Calle el Mirador y 9a Calle Poniente, #249, Col. Escalón, San Salvador, El Salvador, Phone: +50322337946, Email: lreyes@cne.gob.sv
 
 
|Financial support=No
 
|Financial support=No
 
|Technology transfer support=No
 
|Technology transfer support=No
Line 28: Line 27:
 
|Total cost=76
 
|Total cost=76
 
|Comments on financing=Currently the government of El Salvador invests annually approximately 1.2 million dollars in EE measures and it is estimated that such investments will be maintained during the execution of the ProCEEEP and even after its completion. In addition, it is expected that the FEEEP will be created with EUR 62.8 million. The FEEEP will be coordinated by BANDESAL and will provide loans and micro-loans to public institutions. In this way the continuity of EE investments will be ensured. All in all, the overall financing contributions would be of EUR 76.4 million, which will be divided in EUR 11.8 million financed by the NAMA facility for the ProCEEEP, EUR 62.8 million of FEEEP (currently being developed), and EUR 1.8 million for technical cooperation for expert services and consulting. The 11.8 million euros from the cooperative will be used for ProCEEEP. In addition, EUR 2.96 million will be required for the DPP of ProCEEEP NAMA Facility funds are crucial for the development and implementation of ProCEEEP and the DPP. They would act as a catalyst for the implementation of the FEEEP, leveraging the EUR 62.8 million that will be used to maintain the replacement of equipment once ProCEEEP ends. Finally, the ProCEEEP is expected to indirectly mobilize private sector resources to carry out investment in private buildings through raising the awareness of this sector by the demonstration of success in the public sector.
 
|Comments on financing=Currently the government of El Salvador invests annually approximately 1.2 million dollars in EE measures and it is estimated that such investments will be maintained during the execution of the ProCEEEP and even after its completion. In addition, it is expected that the FEEEP will be created with EUR 62.8 million. The FEEEP will be coordinated by BANDESAL and will provide loans and micro-loans to public institutions. In this way the continuity of EE investments will be ensured. All in all, the overall financing contributions would be of EUR 76.4 million, which will be divided in EUR 11.8 million financed by the NAMA facility for the ProCEEEP, EUR 62.8 million of FEEEP (currently being developed), and EUR 1.8 million for technical cooperation for expert services and consulting. The 11.8 million euros from the cooperative will be used for ProCEEEP. In addition, EUR 2.96 million will be required for the DPP of ProCEEEP NAMA Facility funds are crucial for the development and implementation of ProCEEEP and the DPP. They would act as a catalyst for the implementation of the FEEEP, leveraging the EUR 62.8 million that will be used to maintain the replacement of equipment once ProCEEEP ends. Finally, the ProCEEEP is expected to indirectly mobilize private sector resources to carry out investment in private buildings through raising the awareness of this sector by the demonstration of success in the public sector.
|Source of financing=Not known
+
|Source of financing=Multilateral
|Type of financing=Not known
+
|Type of financing=Grant
 
|Total emission reductions=0.26
 
|Total emission reductions=0.26
 
|Highlight=Yes
 
|Highlight=Yes
 
}}
 
}}

Latest revision as of 06:22, 3 October 2017



El Salvador.png
To edit this page, log in and click on "edit with form" above
El Salvador

Description

Overview
Sector Energy
Focus area Energy efficiency
Type of action Strategy/Policy
Scope National
Stage Under development
Submitted to UNFCCC registry No
Start of initiative
(no data)
Financing and support details
Financing status Seeking financing
Total cost EUR 76 mln
Financing requested
(no data)
Financing received to-date
(no data)
Principal source of financing Multilateral
Principal type of financing Grant
Capacity building required No
Technology transfer required No
Additional information
Proponent(s) National Energy Council Governmental El Salvador
International funder(s)
(no data)
Organization providing technical support
(no data)
Contact Luis Reyes, Executive Secretary, Address: Calle el Mirador y 9a Calle Poniente, #249, Col. Escalón, San Salvador, El Salvador, Phone: +50322337946, Email: lreyes@cne.gob.sv
Objective:

The Catalytic Program for Energy Efficiency in Public Buildings (ProCEEEP) will target technological changes in air conditioning systems and lamps that are currently installed in public buildings. In El Salvador, the consumption of electricity by government public buildings (including 7,255 buildings according to the latest government census) is about 245 GWh / year, equivalent to approximately 4.2% of the national demand, which was 5,833 GWh in 2015. ProCEEEP will have a duration of 5 years and will be aimed at reducing 26.84 ktCO2e (or 59.1 GWh) during the period of 2018 to 2022. This will be achieved through the replacement of 20% of the inefficient equipment currently used (air conditioners and lamps) by high efficiency technologies in the public building sector (e.g. inverter mini splits and LED lamps).

Activities: (Error: Invalid time.
ProCEEEP will involves a number of technical cooperation (TC) activities, including the institutional strengthening of the key stakeholders (CNE, MH, and the Ministry of the Environment and Natural Resources, MARN); the design of an EE M&E system, and capacity building for the COEEs.

Impact and MRV

No Data Available.png
Cumulative GHG reductions: 0.26 MtCO2e
Mitigative capacity:

No information has been provided on mitigative capacity

Co-benefits:

Social: Information has not been provided
Economic: Information has not been provided
Environmental: Information has not been provided

MRV Framework:
No MRV plan has been defined